Project Description
The temporary roof structure at Heathlands academy was a great achievement with the square meterage of the project around 900sqm. The temporary roof was to allow for the whole roof to be struck off due to major structural problems which was causing the roof to leak and fall apart. The scaffold structure spanned 33m in places with a spine beam taking the weight. The scaffold was erected as per engineers drawing to ensure maximum efficiency and safety of the build.
Project Details
Project Type: Commercial
Project Start Date: June 2018
Project duration: 16 Weeks