Project Description
Alderney Water Treatment Centre, Poole – Industrial Scaffold Access
High-Tek Scaffolding provided a comprehensive industrial scaffold solution at Alderney Water Treatment Centre in Poole. As a result, the scaffold gave contractors safe and compliant access for essential maintenance and infrastructure works. Because of this, industrial scaffolding on live operational sites demands the highest standards of planning, engineering and safety management.
About the Project
Alderney Water Treatment Centre is a critical piece of infrastructure serving the Poole and Bournemouth area. The maintenance programme required safe access scaffolding for contractors to carry out essential works to the plant and structures.
As a result, High-Tek Scaffolding designed and erected a bespoke scaffold solution. The design was tailored to the complex geometry and operational constraints of the live treatment facility.
Scope of Works
The project involved several key elements. First, the team designed and erected a full access scaffold to meet the specific requirements of the water treatment facility. Second, they installed working platforms and edge protection around all areas requiring maintenance.
In addition, the team built loading bays and materials handling areas to support the maintenance programme. Moreover, they designed the scaffold to avoid interference with the operational plant and processes. The erection and dismantle works were carefully phased around the treatment centre’s operational schedule. Finally, the team adapted the scaffold as the maintenance programme progressed through different areas of the facility.
Health and Safety
Working on a live, critical infrastructure site required an exemplary approach to health and safety. The team prepared full RAMS, which were submitted and approved before any works began. All operatives held current CISRS scaffolding cards and industrial site qualifications.
Moreover, every operative completed a site-specific induction before starting work. The team observed strict permit-to-work procedures throughout in line with site requirements. The scaffold was inspected and documented weekly and after adverse weather events. Consequently, zero incidents were recorded throughout the entire project duration.
Our Service
High-Tek Scaffolding provided a highly professional, responsive service throughout this industrial project. The team coordinated closely with the site management team. As a result, there was zero disruption to the operational facility and the works proceeded efficiently and safely.
Industrial Scaffolding in Poole, Bournemouth and Dorset
High-Tek Scaffolding has extensive experience providing industrial scaffolding for water treatment works, utilities and infrastructure projects across Poole, Bournemouth, Dorset and the South Coast. Contact us today for a free, no-obligation quotation.