Project Description
Regency Court, Boscombe – Perimeter Scaffolding to Commercial Block
High-Tek Scaffolding designed and erected a full independent perimeter scaffold system around Regency Court in Boscombe. The scaffold provided comprehensive access for major refurbishment works to this prominent commercial block. Because the site sits in a busy urban location, the team managed pedestrian access and public safety carefully throughout.
About the Project
Regency Court is a substantial commercial block in Boscombe, Bournemouth. The refurbishment programme required scaffolding to all external elevations. This allowed contractors to carry out facade repairs, window replacement and general building maintenance.
As a result, High-Tek Scaffolding designed and erected an independent tied scaffold system. The design met the programme requirements while maintaining public safety throughout the project.
Scope of Works
The project covered several key areas. First, the team erected a full independent tied scaffold system to all perimeter elevations of Regency Court. Second, they installed working platforms at every level to give contractors safe access for facade and external works.
In addition, the team fitted pavement protection, covered walkways and fans to protect pedestrians below. They also installed debris netting and containment to all elevations. Loading bays supported materials handling throughout the refurbishment works. The scaffold was adapted as the works progressed through different elevations. Finally, a phased dismantle followed the contractor’s programme.
Health and Safety
Managing a large perimeter scaffold in a busy urban location required a robust health and safety approach. The team submitted full RAMS, which were approved before works began. All operatives held current CISRS scaffolding qualifications.
Furthermore, the team implemented and maintained a pedestrian management plan throughout the works. Covered walkways and fans protected the public from overhead working. Weekly scaffold inspections were carried out and recorded in accordance with BS EN 12811. Consequently, the project maintained full compliance with CDM 2015 regulations throughout.
Our Service
High-Tek Scaffolding delivered a reliable, professional service throughout the Regency Court project. The team worked closely with the contractor to ensure the scaffold met the programme at every stage. As a result, all aspects of the scaffold were managed smoothly from design and erection through to final dismantle.
Commercial Scaffolding in Boscombe, Bournemouth and Dorset
High-Tek Scaffolding provides commercial perimeter scaffolding for refurbishment, maintenance and facade works across Boscombe, Bournemouth, Dorset and the South Coast. Contact us today for a free, no-obligation quotation.